It definitely isnt just permits. *looks at vul*
TLG products have to undergo extensive customer qualifications for their offtake agreement, eith increasing scope and scale as it goes further in the qualification process. This is why they are producing a AAM pilot plant as we speak.
This qualification process takes around 2 years to go through and Talga has started this process with the majority of OEM's. No one kno s how far along in the process TLG are with both Talnode C and Talnode Si is all under NDA's.
I would assume some are in later stages than others, with the scale TLG will be able to produce in their pilot plant i assume will be the last stages of the qualifications before offtakes are signed. I think the next 6-12 months will be very interesting as if permitting risk and offtake risk is off the table Talga is set up to become a beast in this future industry.
- Forums
- ASX - By Stock
- TLG
- Ann: World-Class Drill Results Continue at Vittangi
Ann: World-Class Drill Results Continue at Vittangi, page-130
-
- There are more pages in this discussion • 48 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TLG (ASX) to my watchlist
(20min delay)
|
|||||
Last
43.0¢ |
Change
0.020(4.88%) |
Mkt cap ! $163.4M |
Open | High | Low | Value | Volume |
40.0¢ | 43.0¢ | 39.5¢ | $681.5K | 1.664M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 52873 | 42.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
43.0¢ | 47134 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 52873 | 0.420 |
1 | 7716 | 0.415 |
3 | 25033 | 0.410 |
2 | 2496 | 0.405 |
2 | 70000 | 0.400 |
Price($) | Vol. | No. |
---|---|---|
0.430 | 47134 | 4 |
0.435 | 8000 | 1 |
0.440 | 103500 | 3 |
0.450 | 68200 | 4 |
0.455 | 2180 | 1 |
Last trade - 16.10pm 07/08/2024 (20 minute delay) ? |
Featured News
TLG (ASX) Chart |