AVL australian vanadium limited

Jala The best we could hope for is solar with some VRFBs for no...

  1. 3,992 Posts.
    lightbulb Created with Sketch. 1614
    Jala

    The best we could hope for is solar with some VRFBs for no process facilities.
    Ie: camp & office areas.
    The crushing & grinding will require a lot of kilowatts so gas fired piston engines would be the best use there. Due 24 hours operation. Considering we must get a gas supply for the roast then that gas supply can run the gas fired piston engine generators 24/7. So as to stop the trucking of additional diesel for the power generation portion.
    Diesel fuel will still be required for heavy equipment mining wise.
    Although there are now many electric Toyota Land Cruisers being tested in mining applications already.
    So a reduction in fossil fuel is possible but not completely yet available for 24/7 usage.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
1.0¢
Change
0.000(0.00%)
Mkt cap ! $86.34M
Open High Low Value Volume
1.0¢ 1.0¢ 1.0¢ $110.0K 11.01M

Buyers (Bids)

No. Vol. Price($)
36 11807863 0.9¢
 

Sellers (Offers)

Price($) Vol. No.
1.0¢ 2886920 3
View Market Depth
Last trade - 15.46pm 28/07/2025 (20 minute delay) ?
AVL (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.