re: Ann: Yalgoo Iron Ore Project Scoping Stud... Is anyone there???
Looking at the scoping study i am wondering if i am reading this right and would like someone to join me in checking some facts... please.
They are saying their operating costs per MT are about 30.00. That seems very low. The break down is:
Processing costs 7.37
Mining Costs 5.00
Admin 2.00
Product and Transport 10.00
Wharfage and shiploading 5.00
Infrastructure needs equate to 1.4b (includes plant, port, rail)
Then if they are selling 11.4m mt at say aud70 profit per mt pre tax (100-30) or about aud50 after tax (70*.7) thats about aud558m pa. (excludes payback on loans etc)
which means the challenge for this project comes down to securing the finance i guess? i havent seen anything on this yet but will take a look.
im now wondering why no one is talking about this company. maybe i have missed something.
any thoughts from anyone?
- Forums
- ASX - By Stock
- VMC
- Ann: Yalgoo Iron Ore Project Scoping Study Result
Ann: Yalgoo Iron Ore Project Scoping Study Result, page-2
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add VMC (ASX) to my watchlist
|
|||||
Last
6.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $13.09M |
Open | High | Low | Value | Volume |
6.6¢ | 7.0¢ | 6.6¢ | $22.33K | 335.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 40000 | 7.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.0¢ | 72000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 20000 | 0.074 |
2 | 105000 | 0.070 |
1 | 40000 | 0.069 |
1 | 109648 | 0.068 |
1 | 100000 | 0.055 |
Price($) | Vol. | No. |
---|---|---|
0.080 | 72000 | 1 |
0.083 | 7979 | 1 |
0.085 | 17647 | 1 |
0.091 | 18581 | 1 |
0.095 | 23156 | 1 |
Last trade - 10.33am 28/06/2024 (20 minute delay) ? |
Featured News
VMC (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online