HAS hastings technology metals ltd

Ann: Yangibana Ore Reserve Tonnes Up 37% NdPr Tonnes up 18%, page-3

  1. 1,364 Posts.
    lightbulb Created with Sketch. 241
    • Yangibana Rare Earths Project total Ore Reserve increased 37% to 16.7Mt at 0.95% TREO.

    • TREO tonnes rise 15% to 158,400t, with contained Neodymium + Praseodymium (NdPr) - the key

      component in electric vehicle permanent magnets increasing 18% to (58,300t).

    • The increased Yangibana Ore Reserve includes the maiden Ore Reserve for the Simons Find

      deposit 1.7Mt at 0.57% TREO, of which 52% is NdPr unmatched for any rare earths project.

    • Yangibana’s updated Ore Reserve extends mine life to at least 15 years. Ore sorting technology will be incorporated in Yangibana’s mine development for a fourfold economic and operational boost including through:

    o removing 4Mt of waste material from being processed over the life of mine (LOM); o increasingtheTREOplantfeedgradeby26%.o reducing plant reagent consumption and tailings storage volumes by 24%, ando improving sorted ore beneficiation recoveries at Simon’s Find by 7.1%.

 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
29.5¢
Change
-0.010(3.28%)
Mkt cap ! $58.08M
Open High Low Value Volume
30.5¢ 30.5¢ 29.5¢ $51.87K 175.2K

Buyers (Bids)

No. Vol. Price($)
3 16900 29.0¢
 

Sellers (Offers)

Price($) Vol. No.
29.5¢ 7433 1
View Market Depth
Last trade - 16.10pm 28/07/2025 (20 minute delay) ?
HAS (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.