EXR 5.38% 9.8¢ elixir energy limited

Ann: Yangir-2 core-hole spudded, page-226

  1. 3,014 Posts.
    lightbulb Created with Sketch. 5731
    thx to all for the definitions of mud engineer...spot on. I mis-read this term in an earlier post (I was thinking "mud logger" - meaning someone who logs the cuttings and identifies/describes geloogical formations being drilled).

    One of the other key reasons for employing a mud engineer is to balance pressures in the hole by weighting the mud...reading more into this, so maybe one of the problems they had with Yangir-1 was gas overpressure when drilling those pesky gassy coals and they had to kill the hole before it got out of control. Its a good problem to have in one way, but very dangerous if not controlled properly. The results of this hole will def be worth the wait.
 
watchlist Created with Sketch. Add EXR (ASX) to my watchlist
(20min delay)
Last
9.8¢
Change
0.005(5.38%)
Mkt cap ! $117.2M
Open High Low Value Volume
9.5¢ 10.3¢ 9.5¢ $215.9K 2.165M

Buyers (Bids)

No. Vol. Price($)
4 96079 9.8¢
 

Sellers (Offers)

Price($) Vol. No.
10.0¢ 139661 1
View Market Depth
Last trade - 16.10pm 09/08/2024 (20 minute delay) ?
EXR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.