MRE 0.00% 87.0¢ minara resources limited

H1 included a overheated heat exchanger, if I remember...

  1. 5,971 Posts.
    lightbulb Created with Sketch. 1461
    H1 included a overheated heat exchanger, if I remember correctly. I hope H2 will not.

    Costs were $9/lb due to the exchange rate and heat exchanger. $7/lb for the next half with no shutdowns would be nicer.
 
watchlist Created with Sketch. Add MRE (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.