MAY 6.25% 3.0¢ melbana energy limited

Ann: Zapato-1 Drilling Update, page-33

  1. 23 Posts.
    lightbulb Created with Sketch. 3
    No, we latched on the very strong pressure oil in Block 9!
    Thats irrefutable and is derisked. Just a matter of getting that pesky certification once Zapato is done and the well rig is specially rigged to handle that extra oil pressure.
    It'll take time to work out and get or create a rig to handle Block 9.
    And we never said $1. we said 30-50c but I'm happy with 20c within next month or so when Zapato is done and certification is done.
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
3.0¢
Change
-0.002(6.25%)
Mkt cap ! $101.1M
Open High Low Value Volume
3.1¢ 3.1¢ 2.8¢ $248.3K 8.453M

Buyers (Bids)

No. Vol. Price($)
4 750509 2.9¢
 

Sellers (Offers)

Price($) Vol. No.
3.0¢ 24364 1
View Market Depth
Last trade - 16.10pm 05/07/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.