MAY 3.70% 2.6¢ melbana energy limited

Figure 1:Adapted from E. Johnstone and D. Johnstone et. al,...

  1. 6,524 Posts.
    lightbulb Created with Sketch. 2467
    https://hotcopper.com.au/data/attachments/4513/4513217-1aee457907dfe6eddeeac0d706ad2049.jpg
    Figure 1:
    Adapted from E. Johnstone and D. Johnstone et. al, Research and Development into. Predictive Geologic Models for the. Structural Geology of Cuba Block 9 and Beyond. Havana, Cuba - April 2019. https://www.melbana.com/site/cpfile/ 1ad34e99-eff1-4231-8119 b14e3a6ec87f/PresentationGeosciensias2019v3FINAL.pdf, scaled and measured with annotations displaying the information from: ASX reported depths and other predicted depths of significance. ASX:MAY suggests "target structure estimated to begin at 2650 metres" (ASX:MAY, 18/07/2022, 29/06/2022, 16/06/2022, 07/06/2022, 01/06/2022, etc...)
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
2.6¢
Change
-0.001(3.70%)
Mkt cap ! $87.62M
Open High Low Value Volume
2.7¢ 2.7¢ 2.6¢ $40.62K 1.529M

Buyers (Bids)

No. Vol. Price($)
1 318747 2.6¢
 

Sellers (Offers)

Price($) Vol. No.
2.8¢ 15000 1
View Market Depth
Last trade - 16.10pm 17/09/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.