MAY 4.35% 2.2¢ melbana energy limited

Ann: Zapato-1ST Drilling Update and Option Expiry Reminder, page-16

  1. 3,600 Posts.
    lightbulb Created with Sketch. 1914
    Looks like drilling has been slower then expected. I am of the opinion that the lack of wording on oil shows after the initial oil in shakers comment combined with logging runs might indicate they have a zone of interest. This volcanics section is an equivalent to the upper sheet at this location and was probably considered a small marginal play. I think we might have another large potential resource if oil is throughout this section.

    I think that the geo team has underestimated the fractured nature of reservoirs in this fold/thrust belt environment. Combined with the world class source rock and with in the right oil kitchen window has the ingredients for a significant oil province.
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
2.2¢
Change
-0.001(4.35%)
Mkt cap ! $74.14M
Open High Low Value Volume
2.3¢ 2.4¢ 2.2¢ $40.21K 1.760M

Buyers (Bids)

No. Vol. Price($)
18 5561359 2.2¢
 

Sellers (Offers)

Price($) Vol. No.
2.4¢ 3575852 17
View Market Depth
Last trade - 16.10pm 30/07/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.