I also have a bad feeling. Maybe that's why STO didn't "paste"...

  1. 310 Posts.
    lightbulb Created with Sketch. 5
    I also have a bad feeling. Maybe that's why STO didn't "paste" the "Gas discovery" ann from TAP.

    17/2/11
    "The extent and thickness of the gas column will be confirmed when the upper Mungaroo section has been drilled out and wireline logs are run at the appropriate logging point."
    It was done, we've reached the primary target at 4300M.
    Now....
    23/2/11
    " A full suite of wireline logs is planned to be run when the well is at total depth in order to determine the extent and thickness of the gas pay in the well."

    Hope I am wrong.
 
watchlist Created with Sketch. Add STO (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.