"Our View: All four of the Heemskirk deposits are thought to contain areas of high-grade mineralisation. The mineralisation in these stratabound deposits, which vary in lithology, is structurally controlled by faults and fold dilation zones. Dilation zones in the Severn deposit create lenses of higher grade mineralisation within the broader sulphide halo. These deposits could be mined at a higher cut-off grade of 1.0% Sn (currently 0.6% Sn) to increase the overall resource grade to 1.5% Sn. Although this would reduced the resource tonnage to 2.74 Mt, a more selective mining method could be employed, reducing the investment required to initiate mining. This is likely to be considered in the Company’s Fast Start Option Scoping Study, which is expected to be completed in late Q2 or early Q3 this year"
2019 International Tin Association
- Forums
- ASX - By Stock
- SRZ
- Ann: ZS140 Results and Heemskirk Tin Drilling Update
Ann: ZS140 Results and Heemskirk Tin Drilling Update, page-25
-
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SRZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.8¢ |
Change
-0.001(5.26%) |
Mkt cap ! $37.43M |
Open | High | Low | Value | Volume |
1.9¢ | 1.9¢ | 1.8¢ | $58.39K | 3.085M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 1777275 | 1.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.9¢ | 605065 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
7 | 1777275 | 0.018 |
4 | 335270 | 0.017 |
6 | 1445317 | 0.016 |
7 | 3440128 | 0.015 |
8 | 2445312 | 0.014 |
Price($) | Vol. | No. |
---|---|---|
0.020 | 766658 | 1 |
0.021 | 126238 | 2 |
0.022 | 1650000 | 2 |
0.023 | 531500 | 5 |
0.024 | 747211 | 3 |
Last trade - 16.10pm 11/10/2024 (20 minute delay) ? |
Featured News
SRZ (ASX) Chart |