101
Drillstem tests are typically performed on exploration wells, and are often the key to determining whether a well has found a commercial hydrocarbon reservoir. The formation often is not cased prior to these tests, and the contents of the reservoir are frequently unknown at this point, so obtaining fluid samples is usually a major consideration. Also, pressure is at its highest point, and the reservoir fluids may contain hydrogen sulfide, so these tests can carry considerable risk for rig personnel.
The most common test sequence consists of a short flow period, perhaps five or ten minutes, followed by a buildup period of about an hour that is used to determine initial reservoir pressure. This is followed by a flow period of 4 to 24 hours to establish stable flow to the surface, if possible, and followed by the final shut-in or buildup test that is used to determine permeability thickness and flow potential
- Forums
- ASX - By Stock
- LKO
- ann
ann, page-3
Featured News
Add LKO (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.00 |
Change
0.000(0.00%) |
Mkt cap ! $58.8K |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
LKO (ASX) Chart |
Day chart unavailable