BRAMMER ENGINEERING, INC.
Op for Welsh (Re-drill being considered)
Three weeks from Spud 11/19/12 to "UNABLE TO RESTORE WELLBORE; STATUS 32; RR 12/10/12;"
"32 SHUT-IN DRY HOLE - NO FUTURE UTILITY"
But it's "under consideration" for re-drill.
Op for PH (GGE bail out) all over in less than 3 weeks,
17 Jan Spud 4 Feb TVD @ 10500 and WOCR.
HHHHMMMmmmmm
R15
- Forums
- ASX - By Stock
- ann
BRAMMER ENGINEERING, INC.Op for Welsh (Re-drill being...
-
-
- There are more pages in this discussion • 30 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GGE (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.6¢ |
Change
0.000(0.00%) |
Mkt cap ! $12.57M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 230072 | 0.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.7¢ | 5098425 | 12 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 230072 | 0.006 |
9 | 4392622 | 0.005 |
13 | 10795010 | 0.004 |
10 | 8663605 | 0.003 |
7 | 4355000 | 0.002 |
Price($) | Vol. | No. |
---|---|---|
0.007 | 5098425 | 12 |
0.008 | 3877177 | 10 |
0.009 | 592500 | 5 |
0.010 | 445653 | 4 |
0.011 | 100000 | 1 |
Last trade - 16.12pm 16/08/2024 (20 minute delay) ? |
Featured News
GGE (ASX) Chart |
Day chart unavailable