GW1 0.00% 5.0¢ greenwing resources ltd

We had an operational update on the 27th of Feb where it was...

  1. 2,149 Posts.
    lightbulb Created with Sketch. 5792
    We had an operational update on the 27th of Feb where it was stated,

    "The  Company  now  awaits  results  from  these  analyses  with  the  aim  to  estimate  a
    Maiden JORC Resource for the Mahefedok deposit. As planned, analysis results are
    to  be announced in  March."

    "
    To date circa 2,300 metres of drilling have been completed across Zones 1 and 2, with Zone 2 looking particularly promising. There are approximately 200 metres of drilling left to complete the current program.

    The Graphmada laboratory team has prepared circa 2,300 samples from the drilling program  and  regular  shipments  of  samples  have  been  sent  to  SANAS  accredited laboratory Bureau Veritas in South Africa."


    The cyclone turned up on the 7th of March onwards, so perhaps that delayed the last part of drilling and the sending off of the last samples.

    These things are never exact and 6 days after the end of March is hardly a call for concern.  I guess a lot of people were building up the buy side based on the above timeline.  They will be back upon release of the drilling data which should be soon.  Perhaps BSM doesn't feel it should release a negative announcement stating delays if the delay is on the order of a mere few weeks.
 
watchlist Created with Sketch. Add GW1 (ASX) to my watchlist
(20min delay)
Last
5.0¢
Change
0.000(0.00%)
Mkt cap ! $9.062M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
1 12195 4.1¢
 

Sellers (Offers)

Price($) Vol. No.
5.0¢ 915 3
View Market Depth
Last trade - 16.11pm 16/07/2024 (20 minute delay) ?
GW1 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.