KPO 0.00% 0.3¢ kalina power limited

If full development on modularisation was further along than it...

  1. 11,035 Posts.
    lightbulb Created with Sketch. 1822
    If full development on modularisation was further along than it is then I would whole heartedly agree with you.

    But at this stage they are awaiting FTNP to move onto the full engineering and construction of a module designed for use with a gas plant and last we heard were still working through designs for a geothermal module.

    Gas modules could help in Europe by reducing the amount of gas needed to provide the same amount of power however the timelag from where we are to the completion of such set ups in Europe would likely see other suppliers of WHP in a better position than us.

    Sorry if I'm not completely making sense, am not well at present so my brain is in a bit of a fog.
 
watchlist Created with Sketch. Add KPO (ASX) to my watchlist
(20min delay)
Last
0.3¢
Change
0.000(0.00%)
Mkt cap ! $7.459M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
6 17083025 0.3¢
 

Sellers (Offers)

Price($) Vol. No.
0.4¢ 25621397 18
View Market Depth
Last trade - 16.12pm 12/07/2024 (20 minute delay) ?
KPO (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.