Re the latest announcement - they don't get much better then this:
Key points - still dewatering at the same water flow rates
Gas produced from day1.
Excellent pressure and communication between wells
Allows for development using widely spaced wells
Drilling technique allows for increased length of lateral drilling.
Casey as good as announced they have reached their reserves upgrade target.