CTP 2.04% 5.0¢ central petroleum limited

Central Petroleum Limited (ASX:CTP) (“Central”), as Operator,...

  1. 8,114 Posts.
    lightbulb Created with Sketch. 73
    Central Petroleum Limited (ASX:CTP) (“Central”), as Operator, advises that preliminary logging interpretation of the JW-1 well is as follows :
    ?
    Continuous hydrocarbon column from 1,387m to 1,525m (128m).
    ?
    Continuous gross oil column 1,387m-1,485m (98m) in the Stairway Sandstone.
    ?
    No evidence of oil water contact through Stairway Sandstone, through Horn Valley Siltstone (HVS) to the top Pacoota Sandstone at 1,485m.
    ?
    Lower Stairway gross oil column with fair to good porosity 1470.4m-1,485m (14.6 gross), 14.1m nett potential oil payzone (45 feet) with nett average porosity of 11%, average permeability in excess of 33 Millidarcies, and hydrocarbon saturation (Shc) averaging above 50%.
    ?
    The HVS (top 1,485m, base 1,525m-40m interval) shows evidence of gas saturation with average porosities for the unit of 2-5%, thought to be promising for shale gas evaluation.
    ?
    Oil flow to surface from the nett potential payzone is anticipated on flow testing.
    Further logging tests are under way inclusive of a CMI imaging log, a Multi Formation Tester to gain pressure information and a VSP survey (velocity seismic profiling). The well will then be cased with 7” casing to the base of the HVS at approximately 1,525m as a precursor to flow testing the well.
    It has been determined not to drill ahead further in this well and it is planned to flow test the potentially productive zones as soon as possible. Casing to the base of the HVS is planned to be completed by Saturday 25th September 2010 following logging and it is anticipated that initial flow testing should be completed by approximately the 2nd October 2010.
    “There are never are any guarantees in oil exploration but logging results so far are very encouraging and the Company is anticipating that oil will flow to surface when flow tested at Johnstone West-1” said John Heugh, Central’s Managing Director today.
    The Company is evaluating the results not only in the JW-1 well itself but in the context of positive implications in the general area of the Western Amadeus Basin.
    Final interpretation of these hydrocarbon shows and others which may be encountered is dependent on further assessments via electric logging, pressure and flow testing and no conclusions can be reached as to the commercial potential of the Johnstone West prospect until these further assessments are completed.
    Further updates of any significant results will be made as soon as practicable.
    Central is Operator and holds a 90% interest in EP 115, through wholly-owned subsidiary Frontier Oil & Gas Pty Ltd and Trident Energy Limited conditionally holds a 10% interest in the permit. JW-1 is located at Latitude 23 deg 39 minutes and 21.86 seconds South, Longitude 129 degrees 56 minutes and 39.124 seconds East.
    John
 
watchlist Created with Sketch. Add CTP (ASX) to my watchlist
(20min delay)
Last
5.0¢
Change
0.001(2.04%)
Mkt cap ! $37.00M
Open High Low Value Volume
5.0¢ 5.0¢ 5.0¢ $14.33K 286.6K

Buyers (Bids)

No. Vol. Price($)
1 333765 4.9¢
 

Sellers (Offers)

Price($) Vol. No.
5.0¢ 120916 1
View Market Depth
Last trade - 16.10pm 05/09/2024 (20 minute delay) ?
CTP (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.