-
Share
21/11/11
23:41
Share
Yeah i also wonder Famaso.
Im by far no expert in the O&G industry however i do believe its not usually very long.
They usually lower a wireline down to TD and then bring it back up and record what rocktype/hydrocarbon each meter contains.
I think this is a 3-5 day job.
It will just tell us if hydrocarbons are found and if so in what quantity. Nothing to do with flow rates etc.
Like i said im no expert so i could be totally wrong.
Anyone else know?
If this is commercial how much additional funds did VIL require to put this into production?
-