VIL 0.00% 1.6¢ verus investments limited

( A B N 3 4 0 9 0 0 7 4 7 8 5 )566 Elizabeth Street,Melbourne...

  1. 2,367 Posts.
    ( A B N 3 4 0 9 0 0 7 4 7 8 5 )
    566 Elizabeth Street,
    Melbourne 3000
    Victoria Australia
    Telephone: +61 3 9349 1488
    Facsimile: +61 3 9349 1186
    PO Box 12883
    A’Beckett Street Post Office
    Melbourne 8006
    Victoria Australia
    Email: [email protected]
    Website: www.ggpl.com.au
    30 November 2011
    Market Release (via electronic lodgement)
    PROJECT UPDATES
    HUTH PROSPECT Jumonville#4 BULLSEYE PROJECT Jumonville #1
    NAPOLEONVILLE Dugas & Leblanc#3 BOWTIE WEST Sugar Valley #1
    FAUSSE POINT TRG#1 Side-track/ Shallow Propsect
    Golden Gate Petroleum Ltd (ASX: GGP) is pleased to provide a market update on activities involving
    our projects other than the Permian Project which has been provided to the market as a separate
    media release.
    SHALLOW LAUREL RIDGE (HUTH) PROSPECT—JUMONVILLE # 4, 21%WI OPERATOR
    The Justiss Rig # 61 is expected to commence drilling operations on the Huth Prospect within the next 10
    days. The rig is currently completing its last drilling assignment before moving to Bullseye.
    The Huth Prospect is comprised of the mineral rights down to 11,000 ft which contains the producing zone
    at 10,100 ft (the Huth Sand). The Huth Sand has produced over 2.3 million barrels of oil and in excess of
    2.5 billion cubic ft of gas.
    Based on 3D seismic review and recent log indicators, there may be significant amounts of recoverable oil
    remaining in the Huth Sand with 4 locations to be drilled. The Huth Sand has averaged 291,000 barrels of
    oil from the 8 wells produced from the interval.
    GGP’s net cost to participate in the initial well thru completion is approximately $250,000 in net cash after
    offsets for services provided. It is expected that a successful well will have an estimated payout of less than
    six months.
    The 10,100 ft Huth Sand has permeability’s in the 250 to 900 md range; porosities of 25 to 30% and is
    normally pressured with a GOR of 1100 to 1. The prospect trap as covered by 3D is a 4 way closure
    bounded by a stratigraphic pinch out.
    BULLSEYE PROJECT—JUMONVILLE # 1 WELL—54.25%WI OPERATOR
    The Jumonville # 1 well is reaching the end of its productive life from the Miogyp interval. The current plan
    is to suspend production in January 2012 and move up the hole and test the Camerina interval which is
    estimated to contain resources of between 2.2 to 7.1 million bbls of oil and between 2 to 7 BCF of gas. The
    extent of the reservoir is unknown.
    There are two additional intervals also being examined for testing should the Camerina prove unsuccessful.
    NAPOLEONVILLE PROJECT---DUGAS & LEBLANC # 3—15%WI
    The Dugas & LeBlanc # 3 well is currently on production from the “M” Sand and is producing in excess of
    210 bbls of oil and around 1.7 million cubic feet of gas per day.
    BOWTIE WEST---SUGAR VALLEY # 1—18%WI
    We have been advised by the Operator that they are committed to drilling the Sugar Valley # 1 well in
    early 2012. The current plan is to contract a rig to drill two wells, one being the Sugar Valley # 1 and
    another well which does not include GGP as a working interest partner.
    FAUSSE POINT PROJECT---TGR #1 WELL SIDETRACK---NEW SHALLOW OIL TARGET---18%WI
    A side track to the TGR # 1 well targeting a potential 200 acre gas accumulation was identified from
    reprocessed 3D seismic. It has a potential pay interval up to 20 BCF of gas on an unrisked basis . The cost
    of the side track is projected to be around $1 million. Leases over the new target have been put in place by
    GGP and drill site has been readied for new drilling operations.
    The major partner in the project, Verus Investments Limited (ASX: VIL) has been reviewing the option to
    farm out a portion of their 72% working interest. The project remains on hold over the last several months
    pending VIL’s decision.
    A new separate shallow oil target at approximately 3,000 feet has been identified from the analysis of the
    reprocessed 3D seismic. This new potential recoverable resource is estimated to contain up to 2.4 million
    bbls of oil assuming 30% recovery factors. Leasing of the new shallow oil target is almost complete.
    Permitting has commenced and is expected to take several months due to the drill site being in a wetland
    area.
    For further information contact:
    Chris Ritchie
    Financial Controller
    Phone +61 3 9349 1488
    [email protected]
    About Golden Gate: Golden Gate is an independent oil and gas exploration and production company
    listed on the Australian Securities Exchange. Its focus of operations is onshore Texas and Louisiana Gulf
    Coast region and the Permian Basin region of the USA.
    COMPETENT PERSONS STATEMENT: The information in this report has been reviewed and signed off
    by Mr Mark Decker, Geologist (BS. Geology), with over 34 years respective relevant experience within the
    oil and gas sector.
    This report contains forward looking statements that are subject to risk factors associated with resources
    businesses. It is believed that the expectations reflected in these statements are reasonable but they may
    be affected by a variety of variables and changes in underlying assumptions which could cause actual
    results or trends to differ materially, including but not limited to: price fluctuations, actual demand, currency
    fluctuations, drilling and production results, reserve estimates, loss of market, industry competition,
    environmental risks, physical risks, legislative, fiscal and regulatory developments, economic and financial
    market conditions in various countries and regions, political risks, project delay or advancement, approvals
    and cost estimates.
 
watchlist Created with Sketch. Add VIL (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.