Hi Ya
I hope it is okay if I post an extract of a post of yours from 25/9 which states:
chkout the WL/ML logs for H-2 frm 3946-3961m (15m Elang sand). This section flw'd 6 MMcfd at H2 on a < 0.5" choke. Think the Top PLvr sand came in around 3980-4081m (101m thk)"
So today's Update #6 states"
- Drilled 311mm (12 ¼”) hole from 3,740m to 3,828mMDRT
- Ran and cemented 244mm (9 5/8”) casing to 3,818mMDRT
- Currently preparing to test the blow-out preventers (BOP) prior to drilling ahead.
So as of 24 hours ago we were circa 150m right above the top of the primary plover sands. Drilling is very slow, and rightfully so. Must say, slower than I thought (hoped)...
Looks like Dr, IAM and Ya right again re potential TH Thursday / Friday followed by some (hopefully) game changing news!
I will be listening out for my SMS alerts re the next/big announcement.
Back to practicing my patience...
GL to all.
- Forums
- ASX - By Stock
- MEO
- announcement out
announcement out, page-5
-
-
- There are more pages in this discussion • 21 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)