yes gottsy, that's fairly straight fwd.
If the JV think that the lower zones aren't looking too flash (ie low net to gross thickness, with low porosity, permeability, water cut etc etc) post logging this lower 358m section (frm 2509m to 2867m MD) of the 8.5" open hole can be cased/grouted & isolated from the upper section.
If the lower zones r good then they can b tested first (7" liner or uncased entirely ENI's call, my pref is a liner), isolated by a plug later & then the top 3 zones can b tested.
Remember that the top 3 zones r already cased from 2509m upwards & can be perforated, cleaned up prior to a production test.
- Forums
- ASX - By Stock
- NEN
- announcement out
announcement out, page-6
-
- There are more pages in this discussion • 38 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)