AEV 0.00% 0.5¢ avenira limited

SANDPIPER MARINE ROCK PHOSPHATE PROJECT POSITIVE FEASIBILITY...

  1. 336 Posts.
    SANDPIPER MARINE ROCK PHOSPHATE PROJECT POSITIVE FEASIBILITY STUDY RESULTS AND RESOURCE UPGRADE
    18 April 2012
    HIGHLIGHTS
    ? Feasibility Study1 indicates the Sandpiper Project is expected to be technically and economically feasible and has the potential to be a long life project capable of delivering attractive investment returns for the Project owners.
    ? Feasibility Study envisages steady-state production of 3.0 million tonnes per annum (Mtpa) of phosphate concentrate product (rock phosphate) grading 27.5 - 28.0% P2O5 over an initial mine life of 20 years, including a two-year ramp up period.
    ? Increase in estimated Mineral Resource in Measured category to 60 million tonnes (Mt) at 20.8% P2O5 (at 15% P2O5 cut-off). In conjunction with an estimated Indicated Mineral Resource of 105 Mt at 19.6% P2O5 in a sub-area of the Sandpiper Project Mining Lease proposed in the Feasibility Study for initial mining, this provides a mining inventory sufficient for
 
watchlist Created with Sketch. Add AEV (ASX) to my watchlist
(20min delay)
Last
0.5¢
Change
0.000(0.00%)
Mkt cap ! $11.74M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
3 1156486 0.5¢
 

Sellers (Offers)

Price($) Vol. No.
0.6¢ 10091525 13
View Market Depth
Last trade - 07.00am 12/07/2024 (20 minute delay) ?
AEV (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.