    As our stakeholders will be aware, Ironbark was required to complete a feasibility study before it was able to lodge the application for a Mining Licence. The Mining Licence was recently granted but has taken longer than initially anticipated to finalise and Ironbark is now working on updating the costs relating to the Feasibility Study. A current Feasibility Study is required to conclude financing activities. Ironbark appointed CPC Project Design (CPC), an Australian engineering contracting group to both assist Ironbark working with China Nonferrous Metal Industry’s Foreign Engineering and Construction Co., Ltd (“NFC”) on the Citronen project and also to update the Feasibility Study in a traditional Western format. This updated document is expected to be completed in late August, 2017
    Page 1 of the last QAR - http://ironbark.gl/

    I'm traveling at the moment but will ring CPC and ask them direct and also ring JD, hoping to do this over the coming days. With a bit of luck when IBG said late August they meant last day in August. Cheers and GLA all.
 
watchlist Created with Sketch. Add IBG (ASX) to my watchlist
(20min delay)
Last
0.4¢
Change
0.000(0.00%)
Mkt cap ! $6.375M
Open High Low Value Volume
0.4¢ 0.4¢ 0.4¢ $4.833K 1.208M

Buyers (Bids)

No. Vol. Price($)
4 2117531 0.4¢
 

Sellers (Offers)

Price($) Vol. No.
0.5¢ 5429982 9
View Market Depth
Last trade - 15.05pm 21/06/2024 (20 minute delay) ?
IBG (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.