Too little information to say BPAA. Its very much a case of more patience until the jet pump test is complete.
As I have said before the damage in PD-1 was in part due to excessive draw down on the reservoir. They did not want a repeat of this so this well was to be managed in such a way as to control draw down which would mean a rate much less then for PD-1.
What an expected target flow might be I don't know for this stage. 50-80 boepd perhaps which would convert to a very healthy horizontal flow under a development scenario.
- Forums
- ASX - By Stock
- NEN
- announcement
announcement , page-2
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)