Update on Einasleigh Copper Mine Progress
Highlights
7 The Feasibility Study for the Einasleigh Project has now been initiated with
metallurgical work, drilling, permitting and environmental work in full swing.
7 At the Einasleigh Copper Mine prospect, drilling has recommenced after a two month
break. The current hole, END34, is testing for high grade mineralisation north of the breccia
fault.
7 At the Chloe zinc prospect located 20 kilometres SW of Einasleigh, an eight hole
programme is scheduled to start at the conclusion of the Einasleigh programme. Previous
wide-spaced drill holes intersected large thicknesses (15.6m @ 5.9% zinc, 2.0% lead & 41g/t
silver) and high grades (2.0m @ 8.0% zinc, 8.0% lead & 384g/t silver) of mineralisation.
Tom Eadie
Managing Director
Update on Einasleigh Copper Mine Progress Highlights 7 The...
Add to My Watchlist
What is My Watchlist?