I suppose we should be thankful that they didnt postpone the drilling during winter. The weather is proving to be a big obstacle, with hydraulic pipes and drilling mud etc freezing.
Surely we must get an announcement soon about perforating and testing M3#1, but they have been trying to perforate it since October.
If they have got the testing equipment fixed we should see 3 wells being tested in quick succession. It wont allow time for the SP to drift back.
- Forums
- ASX - By Stock
- CIG
- announcement
announcement, page-2
-
-
- There are more pages in this discussion • 31 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)