CTP 6.00% 5.3¢ central petroleum limited

Drilling : Having unsuccessfully attempted to run cement plug...

  1. 10,475 Posts.
    lightbulb Created with Sketch. 7
    Drilling : Having unsuccessfully attempted to run cement plug over troublesome tight hole section c. 1300m now running 7” casing over problem zone prior to running electric logs. At 0600 this morning, casing was down to c.900m. It is considered important to have electric logs over the Purni Formation as coals and some sandstones may have sufficient gas saturation to warrant testing.

    So down c. 900m from yesterday, moving towards wire logging. What can you say. Waiting waiting waiting. Inch by inch.

    Market is just yuk in general.
 
watchlist Created with Sketch. Add CTP (ASX) to my watchlist
(20min delay)
Last
5.3¢
Change
0.003(6.00%)
Mkt cap ! $39.22M
Open High Low Value Volume
5.5¢ 5.5¢ 5.3¢ $8.576K 158.3K

Buyers (Bids)

No. Vol. Price($)
1 10000 5.2¢
 

Sellers (Offers)

Price($) Vol. No.
5.3¢ 64939 1
View Market Depth
Last trade - 16.10pm 16/08/2024 (20 minute delay) ?
CTP (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.