GGE 20.0% 0.4¢ grand gulf energy limited

announcemet

  1. 140 Posts.
    lightbulb Created with Sketch. 9
    "The Board is pleased to advise that a 24hr workover rig has commenced operations to perforate and place on
    production the primary “M” sand objective at the Dugas & LeBlanc # 3 development well. The operation is expected
    to be completed within 7 days."
 
watchlist Created with Sketch. Add GGE (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.