PUA 0.00% 0.3¢ peak minerals limited

Some key grabs from the annual report.Substantial progress has...

  1. 667 Posts.
    Some key grabs from the annual report.

    Substantial progress has been made during the year
    with the development of the Reward Gold Mine to the
    south of the town of Hill End. Initial sampling of high
    grade material from the development was processed
    and the first gold pour took place on 11 April 2008.
    An increase in mining and plant processing has continued
    since that time and by the close of the year, the
    Reward Exhibition shaft raise boring was completed
    and steelwork fabrication was well underway.

    The Reward Gold Mine development is targeting the
    initial resources outlined by surface drilling in 2007 of
    124,400 tonnes at 19g/t gold, which are indicated to
    be conservative based on the development and processing
    results to date. Recent underground diamond
    drilling has further extended the known high grade
    gold mineralisation in the Hawkins Hill–Reward area
    beyond the current resource blocks.

    Increase gold production from the Hill End Project
    with targeted resource potential of 4–5 million
    ounces.

    The Reward underground development has advanced more than 1,000 metres beneath the old near surface workings
    of Hawkins Hill and Reward and has connected with the new 230 metre Reward Shaft. This shaft now has ten levels
    which will provide mining access to the resources above the Amalgamated level, particularly the Paxton’s veinset
    which has an initial drill delineated resource of 23,000 tonnes at 48g/t gold within the current provisional Reward
    resource estimate of 159,000 tonnes at 17g/t gold.

    Hargraves and Windeyer. Together these goldfields have
    produced over two million ounces and large individual
    pieces of gold from shallow workings such as the
    Holtermann’s Nugget at 3,100 ounces from Hawkins
    Hill, the Kerr’s Hundredweight at 1,546 ounces from
    the BNH deposit and in the nearby Louisa, Daly and
    Meroo Creeks many large nuggets were found, with
    the ‘King of Waterworn Nuggets’ being the largest at
    2,680 ounces of gold.

    During the year a total of $11.4 million was raised
    through the conversion of 65.4m HEGO 15c options
    into HEG fully paid ordinary shares and the issue of
    54.2m HEGOB 25c options at 3c each.

    Plant
    The gravity gold process plant was originally designed
    for batch sampling small parcels of Reward development
    material and is now operating on two shifts per day and
    processing about 50 tonnes per day. Stope development
    and initial stoping of the M2 and Paxton’s veinsets is
    expected to continue to demonstrate the profitability of
    the very high grade zones and the plant will be improved
    to optimise throughput and gold recovery. The removal
    of bottlenecks in the plant has improved production,
    and as the underground opens up, the target production
    rate is about 100 tonnes per day.

    The plant gold grade has been 2–3 times higher than
    the grade estimate of the 2007 Reward drill delineated
    resource blocks which have been mined to date in the
    Paxton’s and M2 veinsets. The average plant feed grade
    for 1,683 tonnes mined and processed from these blocks
    is 22.7g/t gold compared to the drill estimated resource
    block grade of 10.0g/t gold.

    As the M2 and Paxton’s high grade areas are opened up
    for stoping, the Amalgamated process plant feed grades
    may be up to two ounces per tonne, which would
    indicate an annualised production rate of about 50,000
    ounces, at reasonable plant availability and continuous
    operation.
 
watchlist Created with Sketch. Add PUA (ASX) to my watchlist
(20min delay)
Last
0.3¢
Change
0.000(0.00%)
Mkt cap ! $2.993M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
13 26597482 0.2¢
 

Sellers (Offers)

Price($) Vol. No.
0.3¢ 2607338 4
View Market Depth
Last trade - 16.12pm 08/08/2024 (20 minute delay) ?
PUA (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.