I think if we look at scenarios, the better option would be a acceptance of profuts or further extension and this is entirely possible. I don't think it's a 'walk away' from deal and this is reflected in the price. IMO, there is a far greater probability that a further extension will be requested than final test results. I know that if I was given a 60 day deadline and I needed a bit more time, I would request an additional evaluation period. The price tells the story.
iPod
AUCTIONEER
Add to My Watchlist
What is My Watchlist?