As production unfolds over the next 12 months or so real cash flow will dictate the SP, not flashy Jorcs.
Really not so hard to do some basic projections based on the data at hand. Ph2 feasibility will no doubt make that a lot clearer, with most likely a lower CoP than from the legacy Ph1 plant. Doubt sovereign risk or infrastructure costs will feature prominently though.