Kennethgalbraith,
The way i read it is the 8c is NOT included in the 63c cash costs...Why? For accounting purposes the pre-strip is capex so is amortarised over the remaining life of the mine ie out to 2015.
So the real costs are 71c...hey i might be wrong and happy to, but that will take the pre-strip to final stage 5 and finish it..
Then the costs of mining will fall from 2010 all thru til 2015. LOM costs are actually 52usc/lb til 2015.
Hope this helps
Muzza
- Forums
- ASX - By Stock
- another zinc miner bites the dust
Kennethgalbraith,The way i read it is the 8c is NOT included in...
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
CC9
Chariot Corporation (ASX:CC9) refines Black Mountain strategy, launching Pilot Mine to seize U.S. lithium opportunity