From The Announcement- Outlook -Plug and abandon
Progress Summary
Progress since last report:
- Carried out wireline logging and side wall coring program
- Ran 178mm (7”) liner
Present Operation (at 06:00 Darwin time, 13th December 2013) :
- Completing installation of 178mm (7”) liner
Outlook:
- Complete installation of 178mm (7”) liner
- Carry out production test
- Plug and abandon well