You've come up with some pretty good numbers, off what limited information we have. I agree in the sense of salvaging the best parts and usable machinery and tearing down the old structure. No doubt every pump, flot cell, tank, roller will have to be removed and replaced with maybe salvaging belts, crushers, sag and ball mill being some key components. Of what i can see from aerials the surface plant, is not all that big. Pending on what is salvageable they could have the option to run side by side units to keep the accuracy of the output up. If the mills arent rusted away that is. But that will all be released in a feasibility study of the plant.
- Forums
- ASX - By Stock
- any idea on size of reserve
You've come up with some pretty good numbers, off what limited...
-
- There are more pages in this discussion • 65 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RXL (ASX) to my watchlist
|
|||||
Last
13.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $52.91M |
Open | High | Low | Value | Volume |
13.0¢ | 14.0¢ | 13.0¢ | $156.1K | 1.178M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 521631 | 13.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
13.5¢ | 7922 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 321631 | 0.130 |
10 | 977146 | 0.125 |
7 | 1528726 | 0.120 |
3 | 67408 | 0.115 |
2 | 36699 | 0.110 |
Price($) | Vol. | No. |
---|---|---|
0.140 | 249694 | 3 |
0.145 | 65000 | 1 |
0.150 | 74109 | 4 |
0.160 | 21774 | 1 |
0.165 | 126061 | 1 |
Last trade - 16.10pm 28/06/2024 (20 minute delay) ? |
Featured News
RXL (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online