https://youtu.be/DZhmWE1Rud8
After watching this video, it sounds like MWL still need a few things approved to start drilling, Michael mentions 90% and 50%+ approvals received so far at their two priority drill locations? Also the mention of searching for an experienced cold weather driller suggests 1st drilling is still months away, or maybe thinking ahead for a long drill campaign?? I will be watching eagerly for a firm rig booking and a drill date before investing. Though IR1 next results might force hands early if their 100m+ pegs are full of lithium with MWL's proximity to IR1.
MWL
midwest lithium limited
https://youtu.be/DZhmWE1Rud8After watching this video, it sounds...
Currently unlisted. Proposed listing date: N/A