MAY 1.85% 5.5¢ melbana energy limited

AP We Need a 2nd Drill Rig for Block 9 ASAP

  1. 2,135 Posts.
    lightbulb Created with Sketch. 965

    IMO a 2nd smaller drill rig is required to start production ASAP from Amistad which has a combined 119 million barrels of Prospective Resource (100% share, unrisked mean estimate). Amistad is shallower than the other oil zones and as such should be able to be drilled quicker and with a smaller drill rig.
    If a smaller drill rig is found we could be producing in 1-2 months. This 2nd drill rig should be used only for exploiting the shallower Amistad oil zone and they should be aiming to have at least 10 production wells from this upper sheet within a year.
    Once production starts from Amistad this will totally de-risk MAY as spec oil stock and will become an oil producer. We will no longer have these wild swings in the share price and MAY will find a stable share price well above what it is now.
    I have no doubt the current cash reserves of $32 million and another $18 million coming from excise of options is more than enough to finance our 30% share of a 2nd smaller drill rig.
    This will allow the current bigger drill rig to be used to exploit the oil from the lower sheets of Alameda and Marti after Zapato and can then be used to explore the other prospects in Block 9.
    The oil from Amistad is probably heavier than the oil from the lower sheets and likely to be the same oil type being extracted from the Varadero oil field. Even though its a heavier oil, it should still be able to command a good price with the current high oil prices.
    This type of heavy oil is being used for Cuba's energy generation for their electricity supply.
    Oil production from the Varadero oil field is on a steep downward trend, from its peak in 2019 at 32,000 bopd to about 22,000 bopd now and falling (see graph below), Cuba is desperate for this type of heavier oil now and even more in the coming years, Amistad oil will be the ideal solution to their heavy oil shortfall.

    Varadero Oil Production Past & Future:


    50% of the country’s daily output.


    Total Production, boed20,000-10,000-5,00005,00010,00015,00020,00025,00030,00035,00040,000L199019952000200520102015202020252030203520402045205020552060Value

    Remaining recoverable reserves


    Last edited by The Mechanic: 07/05/22
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
5.5¢
Change
0.001(1.85%)
Mkt cap ! $185.3M
Open High Low Value Volume
5.5¢ 5.5¢ 5.3¢ $95.86K 1.783M

Buyers (Bids)

No. Vol. Price($)
1 64900 5.3¢
 

Sellers (Offers)

Price($) Vol. No.
5.5¢ 259815 3
View Market Depth
Last trade - 16.10pm 09/05/2024 (20 minute delay) ?
Last
5.3¢
  Change
0.001 ( 0.00 %)
Open High Low Volume
5.5¢ 5.5¢ 5.2¢ 624729
Last updated 15.59pm 09/05/2024 ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.