I like your enthusiasm but but i am confident you cant design and build an operational plant inclusive of well head, separators, tanks, flare, pipe runs, power generation etc, not to mention approvals from government, this would take a few years at best. Perhaps they could have a temporary pilot/testing plant or something in a 6+ month time frame if there are options like that? Remember it takes 9 -12 months to build a house with 4 walls and a roof. IMO if MAY can get a good result from Zapato and relocate the rig to Alameda ready with long lead items to drill and flow test I will be very happy with the progress for this year.
- Forums
- ASX - By Stock
- MAY
- AP We Need a 2nd Drill Rig for Block 9 ASAP
AP We Need a 2nd Drill Rig for Block 9 ASAP, page-3
-
- There are more pages in this discussion • 133 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MAY (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.9¢ |
Change
0.001(3.57%) |
Mkt cap ! $94.36M |
Open | High | Low | Value | Volume |
2.9¢ | 3.0¢ | 2.8¢ | $118.4K | 4.032M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
18 | 2515422 | 2.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.9¢ | 158000 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
17 | 2447783 | 0.028 |
11 | 1508817 | 0.027 |
8 | 1643577 | 0.026 |
11 | 1961000 | 0.025 |
3 | 270300 | 0.024 |
Price($) | Vol. | No. |
---|---|---|
0.029 | 208000 | 3 |
0.030 | 1989855 | 4 |
0.031 | 490744 | 3 |
0.032 | 531432 | 6 |
0.033 | 1406635 | 4 |
Last trade - 10.59am 03/07/2024 (20 minute delay) ? |
Featured News
MAY (ASX) Chart |
The Watchlist
RCE
RECCE PHARMACEUTICALS LTD
James Graham, CEO
James Graham
CEO
Previous Video
Next Video
SPONSORED BY The Market Online