MAY 3.57% 2.9¢ melbana energy limited

AP We Need a 2nd Drill Rig for Block 9 ASAP, page-3

  1. 19 Posts.
    lightbulb Created with Sketch. 11
    I like your enthusiasm but but i am confident you cant design and build an operational plant inclusive of well head, separators, tanks, flare, pipe runs, power generation etc, not to mention approvals from government, this would take a few years at best. Perhaps they could have a temporary pilot/testing plant or something in a 6+ month time frame if there are options like that? Remember it takes 9 -12 months to build a house with 4 walls and a roof. IMO if MAY can get a good result from Zapato and relocate the rig to Alameda ready with long lead items to drill and flow test I will be very happy with the progress for this year.
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
2.9¢
Change
0.001(3.57%)
Mkt cap ! $94.36M
Open High Low Value Volume
2.9¢ 3.0¢ 2.8¢ $118.4K 4.032M

Buyers (Bids)

No. Vol. Price($)
18 2515422 2.8¢
 

Sellers (Offers)

Price($) Vol. No.
2.9¢ 158000 2
View Market Depth
Last trade - 10.59am 03/07/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.