I like your enthusiasm but but i am confident you cant design and build an operational plant inclusive of well head, separators, tanks, flare, pipe runs, power generation etc, not to mention approvals from government, this would take a few years at best. Perhaps they could have a temporary pilot/testing plant or something in a 6+ month time frame if there are options like that? Remember it takes 9 -12 months to build a house with 4 walls and a roof. IMO if MAY can get a good result from Zapato and relocate the rig to Alameda ready with long lead items to drill and flow test I will be very happy with the progress for this year.
- Forums
- ASX - By Stock
- AP We Need a 2nd Drill Rig for Block 9 ASAP
I like your enthusiasm but but i am confident you cant design...
-
- There are more pages in this discussion • 133 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MAY (ASX) to my watchlist
|
|||||
Last
4.3¢ |
Change
-0.002(4.44%) |
Mkt cap ! $144.9M |
Open | High | Low | Value | Volume |
4.5¢ | 4.6¢ | 4.2¢ | $176.8K | 4.017M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
10 | 1371566 | 4.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.3¢ | 164997 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
10 | 1371566 | 0.042 |
7 | 685003 | 0.041 |
8 | 1189501 | 0.040 |
13 | 1477793 | 0.039 |
7 | 3876665 | 0.038 |
Price($) | Vol. | No. |
---|---|---|
0.043 | 164997 | 1 |
0.044 | 250000 | 2 |
0.045 | 424071 | 4 |
0.046 | 941966 | 4 |
0.047 | 496555 | 5 |
Last trade - 16.10pm 20/06/2024 (20 minute delay) ? |
Featured News
MAY (ASX) Chart |
The Watchlist
HAR
HARANGA RESOURCES LIMITED.
Peter Batten, MD
Peter Batten
MD
Previous Video
Next Video
SPONSORED BY The Market Online