TCM 0.00% 0.3¢ tiaro coal limited

aquisition of tenements, page-13

  1. AI
    1,505 Posts.
    COK drilling ann today, this is between 1237 and 1261 in the maps earlier on this thread.

    BOWEN BASIN DRILLING UPDATE
    HIGHLIGHTS
    Bowen Basin - Baralaba Area
    􀂃 Ninety one holes drilled for 14,378 metres to June 2008.
    􀂃 Cumulative down-hole coal intercepts of up to 29.7 metres with average intercepts of 6.9 metres, over an area of 4.8 sq km.
    􀂃 Definition of 2.85 km northwards extension of multiple key economic seams in EPC 1047.
    􀂃 The coal zone in EPC 1047 is up to 1.5 km wide.
 
watchlist Created with Sketch. Add TCM (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.