Not likely.
diamond drilling takes a bit of time. They will probably average 50-70m per day given that most of the holes are relatively deep (150 to 300m).
Previous announcement stated first three holes will test the IP anomaly below the historic workings (200m each) and then two holes will be drilled into the gravity anomalies (150m and 300m). So likely they haven't started drilling the big anomaly.
RAB drilling will be progressing faster.