LOM 13.7% 8.3¢ lucapa diamond company limited

Yeah I worked briefly on the NTP too. Interesting concept. Too...

  1. 2,630 Posts.
    lightbulb Created with Sketch. 137
    Yeah I worked briefly on the NTP too.

    Interesting concept. Too hard to logistically work though I think. Rigs use a decent bit of fuel so would either need large onsite storage for fuel or the ability to get fuel to the rig. Plus personnel too and from the rig. If it's too wet then this becomes quite difficult. Regardless of if the rig can still work in those conditions.
 
watchlist Created with Sketch. Add LOM (ASX) to my watchlist
(20min delay)
Last
8.3¢
Change
0.010(13.7%)
Mkt cap ! $24.08M
Open High Low Value Volume
8.6¢ 8.7¢ 8.0¢ $14.39K 175.8K

Buyers (Bids)

No. Vol. Price($)
1 1300 7.8¢
 

Sellers (Offers)

Price($) Vol. No.
8.3¢ 28981 1
View Market Depth
Last trade - 15.52pm 07/06/2024 (20 minute delay) ?
Last
8.3¢
  Change
0.010 ( 10.7 %)
Open High Low Volume
8.3¢ 8.3¢ 8.0¢ 59089
Last updated 15.28pm 07/06/2024 ?
LOM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.