BMO 0.00% 0.6¢ bastion minerals limited

area 1 lower zone drill results

  1. 7,404 Posts.
    1
    29 November 2005
    Company Announcements Office
    Australian Stock Exchange
    Level 4, Exchange Centre
    20 Bridge Street
    Sydney NSW 2000
    Area 1 Lower Zone Drill Results
    Recent drilling at the 309 mine has confirmed an extension to the Area 1 gold mineralisation
    between 1165 and 1145RL. This lower structure is in a zone that this is below the current
    15,000 ounce reserve. The mineralisation is dipping to the north east and is open along strike.
    Re-estimation of the Area 1 reserve is in progress and will be completed by mid December.
    Mining operations will commence in Area 1, with development ore from the access drives
    scheduled in December and production mining to commencing in February. Additional
    reserves from Area 1 will provide useful early cash flow while development proceeds to Area 2
    where the bulk of the currently known reserves are located.
    Recent Drilling Results – Area 1
    Hole Id North East EOH
    Depth
    Intersect
    RL
    From To Length Au
    g/t
    Comments
    THRC_863 10012 4910 108 1215 41 42 1 48.9
    1188 68 68 1 16.7 65-95m
    1161 94 100 6 9.2
    Including 94 96 2 13.3 1165m to 1145mRL
    extension
    1157 98 100 2 12.7 1165m to 1145mRL
    extension
    THRC_864 10009 4920 114 1215 39 40 1 7.3 57-65m
    1195 58 65 7 8.7 104-110m
    1152 103 105 2 8.9 1165m to 1145mRL
    extension
    THRC_865 10009 4930 102 1175 79 84 5 12.5 51-88m
    1169 86 88 2 45.9 100-107m
    1160 96 97 1 7.7 1165m to 1145mRL
    extension
    THRC_866 10013 4940 104 1257 48 52 4 10.9 50-65m
    77 78 1 5.1
    1160 96 102 6 21.2
    Including 96 99 3 38.6 1165m to 1145mRL
    extension
    1155 101 102 1 6.8 1165m to 1145mRL
    extension
    THRC_867 10027 4930 108 1203 52 53 1 20.8 48-65m
    1150 106 107 1 10.9 1165 to 1145RL
    extension
    Previous drill holes in the same lower structure returned:
    • THRCD843 6m at 21.9g/t Au
    • TRCD618 5m at 25.2g/t Au (includes 1m at 73.3g/t Au)
    • TD723 1m at 32.5g/t Au
    • THRCD814 2m at 11.35g/t Au
    • TRCD684 4m at 6.1g/t Au
    This round of drilling entailed 650m of reverse circulation drilling sampled at 1m intervals and
    was designed to intercept below the reserve and to firm up the lateral extents of the Area 1
    reserve. All holes are vertical and a cut-off grade of 5g/t Au used for the top and bottom of
    the mining section and for internal dilution. No top cut has been applied.
    The holes in this programme also intercept the outer fringes of the upper section of
    Area 1.
 
watchlist Created with Sketch. Add BMO (ASX) to my watchlist
(20min delay)
Last
0.6¢
Change
0.000(0.00%)
Mkt cap ! $2.610M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
12 4627953 0.5¢
 

Sellers (Offers)

Price($) Vol. No.
0.7¢ 2445571 5
View Market Depth
Last trade - 16.12pm 09/08/2024 (20 minute delay) ?
BMO (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.