Let break it down into a real figure. Current rail track producer required 70kg/meter. you can check out on Wikipedia
600km distance would required (600x1000)x70kg of steel x4 assuming 2 lines and each line have 2 tracks. So the minimal steel requires by ARI is 168,000 tones of special made steel for rail. With current world market steel is $185/tone (China made). Let say with special required to enhance it structure let say come around $400/tone by ARI. Therefore the projection cost would be some where (168,000 x $400) around $67mil.
- Forums
- ASX - By Stock
- ARI
- Arrium Media Thread
Arrium Media Thread, page-4
-
- There are more pages in this discussion • 10 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ARI (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.4¢ |
Change
-0.001(2.86%) |
Mkt cap ! $21.03M |
Open | High | Low | Value | Volume |
3.5¢ | 3.5¢ | 3.4¢ | $9.105K | 263K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 137470 | 3.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.5¢ | 180300 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 137470 | 0.034 |
1 | 152379 | 0.033 |
2 | 893000 | 0.032 |
1 | 250000 | 0.031 |
3 | 941378 | 0.030 |
Price($) | Vol. | No. |
---|---|---|
0.035 | 180300 | 3 |
0.036 | 27399 | 1 |
0.037 | 99000 | 1 |
0.038 | 283504 | 2 |
0.039 | 598837 | 6 |
Last trade - 10.43am 15/10/2024 (20 minute delay) ? |
Featured News
ARI (ASX) Chart |
The Watchlist
JBY
JAMES BAY MINERALS LIMITED
Andrew Dornan, Executive Director
Andrew Dornan
Executive Director
Previous Video
Next Video
SPONSORED BY The Market Online