Fitnfam the jobs were cut from mainly BGC knob and duke around sept/Oct was more then was reported 125 but was over 150, also bis lost heaps at knight, Lucas also cut at Barron. The fines tipped at IH have a loader feeding filtercake into a hopper that feeds the belt at the rate of 400tn per 4000 ore. So mixed on belt, layered on floor then next product layered on top, better results I was told they hit the grades perfect and the complaints about ore mix have been solved. Before it was just loaded and when unloaded some places got high some got super low grade. The other 200 are steel workers but that's probably not until june16. ARI pushing to increase 500k tonns a year on same infustructure in a meeting this week.
ARI Price at posting:
5.5¢ Sentiment: None Disclosure: Not Held