You can't miss gas/condensate on logging. So if the log confirm gas, we are 100% certain. The next question is if it flows and how much. Gas reservoir generally can flow but how much depending on the reservoir quality (tight sand vs permeable sand...). It can be a big news where they need gas for power the most. Easily double from here if flow something like 25 MMcfd+ next week.
- Forums
- ASX - By Stock
- article for your general information...
You can't miss gas/condensate on logging. So if the log confirm...
-
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NEN (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online