Checking the wogc website it looks like ELK has applied for approvals to re-enter 6 wells.
Trusler 9 had additional perforations done in the higher Shannon formation, I expect this was to increase the capacity for water injection.
Truslers 2, 8, 13, 15 and Barry 2 have been/are to be worked over.
Meanwhile Trusler 1 was producing an average of 10bopd in January at an oil cut of around 3%.
Are these work-overs being done in preparation of running a pilot for the chemical flood? And has the field be unitised?
There should have been an update on the progress of these work-overs.