MGX 3.57% 40.5¢ mount gibson iron limited

equally importantly I believe he also stated that the superceded...

  1. 214 Posts.
    equally importantly I believe he also stated that the superceded fleet would probably be used at extension hill on the first stage of the haematite extraction thereby significantly reducing capex and bringing forward start date etc.

    Additonally its worth noting that the only reason the much bigger capacity fleet was brought in for tallering pk is because of the overburden/waste issue.

    Note the waste estimate 07 is app 33mt, 08 is 24mt, 09 is 15mt etc get the drift. This is not an issue at ext hill where waste/ore ratio 1:1 not 1:10 reducing.

    This will allow you'd think the bigger cats etc to be shipped wherever required. ...say to an expansion of tallering pk or even ext hill upgraded or even a third party green fields site. May not sound like much but you try getting mining equip at the moment.

    my opinion only etc.


 
watchlist Created with Sketch. Add MGX (ASX) to my watchlist
(20min delay)
Last
40.5¢
Change
-0.015(3.57%)
Mkt cap ! $492.0M
Open High Low Value Volume
42.0¢ 42.0¢ 40.5¢ $655.7K 1.597M

Buyers (Bids)

No. Vol. Price($)
2 166958 40.5¢
 

Sellers (Offers)

Price($) Vol. No.
41.0¢ 31818 5
View Market Depth
Last trade - 16.10pm 24/06/2024 (20 minute delay) ?
MGX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.