In January of this year, EMC were awaiting the arrival of 5000 solar panels for the 1.6 MW array they had been building for ASKAP at Murchison.
Photos on the ASKAP site show the panels are now installed. The next stage involved the installation of 2.5 MWh battery storage system.
I am wondering how much of EMC's $16 million revenue in 2016 is from the Murchison site?
Also, I am wondering how much additional revenue will be added when the battery storage system is operational?
Perhaps someone with solar energy knowledge might give us a rough estimation?
Add to My Watchlist
What is My Watchlist?