ASN 0.00% 7.5¢ anson resources limited

According to NVX, LKE testing process is expected to take at...

  1. 2,979 Posts.
    lightbulb Created with Sketch. 844
    According to NVX, LKE testing process is expected to take at least four months’ time, and the initial results are expected within around two months (in February) after producing the cathode material, this is very close now, ASN have better purity, if NVX have used or setup cathode material they would have at least tried ASN samples, if LKE results are good, our share will fly on that day and we should see our initial results sooner than expected then
 
watchlist Created with Sketch. Add ASN (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.