ASN 3.13% 16.5¢ anson resources limited

ASN General Discussion, page-16614

  1. 3,125 Posts.
    lightbulb Created with Sketch. 740
    Jnene production is 100% 2027 mate. 2025 is impossible. Look how much ASN has achieved in the last 12 months.

    The Feed is not finished until Q1 next year. Off-takes, Loan stuff .. Green River on the side. If we genuinely started construction mid 2025 that would be an awesome result. Which is only 18 months away. Time goes quick.

    It takes time to build it. It also takes a heap of time to commission it up to name plate. That is 6 months in itself. Commissioning can often take longer resulting in very quick capital losses and sometimes CR's are needed to bridge the gap. A lithium carbonate plant is extremely complex. You do not just build it, turn it on a away you go. Has to be dialled in. AGY are finding exactly what I am saying right now.


 
watchlist Created with Sketch. Add ASN (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.